



Drawings and models checked against site, with clashes detected and reported before work starts.
Quantities measured from drawings and models for ordering and cost control.
Surface models and data prepared for GPS-guided plant.
Setting-out records, as-built drawings and QA sheets issued for every package.
Primary and secondary control stations and benchmarks established and verified.
Foundations, piles, drainage, roads, kerbs and structural grids set out to line and level.
Completed work surveyed and reported against the specified tolerances.
07724 100409